ASTHIWAR

Project

Aether

A bespoke 2,450 sq.ft 3BHK semi-furnished duplexes situated on a prominent 60-ft and 30-ft corner road in Cheran ma nagar. Built with uncompromised material quality, skilled labour, perfect Vaasthu and Manai Adi Sastra adherence, and two-car luxury parking.

Cheran ma nagar, Coimbatore, Tamil Nadu2025
StructureRCC Moment Frame & Machine-Cut Masonry
EnvelopeRecessed Balconies & Weather-Shield Plaster
Thermal Delta-4.6°C Solar Differential
Site Datum11°03'12"N 76°59'45"E • Cheran ma nagar
Location
Cheran ma nagar, Coimbatore, Tamil Nadu
Typology
3BHK Semi-Furnished Duplex
Built-up Area
2,450 sq.ft (3.3 Cents Plot)
Year
2025
Status
Completed

Overview

Engineered on 3.3 cents of corner land, Aether harmonizes spatial abundance with rigorous structural planning. The thoughtfully designed layout features an expansive 16’ × 16’ living hall, two grand 16’ × 16’ master bedrooms, an additional 10’ × 16’ bedroom, a dedicated pooja room, an external utility zone, and covered parking for two full-size luxury vehicles.

Challenge

The corner junction of 60-foot and 30-foot roads required dual-frontage acoustic and visual privacy while ensuring abundant natural cross-ventilation. Furthermore, aligning room dimensions strictly with traditional Manai Adi Sastra benchmarks required zero-tolerance structural grid calibration.

Approach

ASTHIWAR integrated architecture and structural engineering under one hand. We staggered window fenestrations with deep balcony projections, deployed an optimized moment-resisting RC frame to keep living areas column-free, and ensured every space complies with solar and airflow paths for natural cooling.

Materials

  • Primary Fe550D TMT Reinforcement Steel
  • Solid High-Density Masonry Blocks
  • Smooth Slaked Lime Plaster Wash
  • First-Quality Teak Joinery & Doors
  • Large-Format Vitrified Tile Flooring
  • Toughened Glass Balcony Balustrades
  • Weatherproof Exterior Emulsion Coatings

Timeline

  1. Design & Vaasthu Alignment

    2 Months

    Site survey, Manai Adi Sastra grid calibration, concept and structural analysis

  2. Superstructure & Masonry

    5 Months

    Isolated column footings, RCC moment frame, precision block masonry

  3. Envelope & Finishes

    4 Months

    Concealed MEP installations, teak joinery, lime plaster, vitrified flooring

  4. Commissioning & Handover

    1 Month

    750+ quality checklist sign-offs, service testing, turnkey handover in 2025

Gallery

Finished

8 images

Design

7 images

Construction

7 images